MUSA

Management and Uncertainties of Severe Accidents.

In the current state of maturity of severe accident (SA) codes, MUSA fosters BEPU (Best Estimate Plus Uncertainties) methodology application vs. deterministic analysis for SA management.

Principal investigator
Prof. Sandro Paci

Gruppo di ricerca
Sandro Paci, Nicola Forgione, Walter Ambrosini, Michela Angelucci

Funder: H2020-Euratom-1.1
Relevance: European
Budget: 5.8 M€ (UNIPI: 248k€, partner)


http://musa-h2020.eu/

27 PARTNERS, SPREAD ACCROSS 3 CONTINENTS

BEL V, Belgium
CEA, France
CHINA NUCLEAR POWER TECHNOLOGY RESEARCH INSTITUTE Co. Ltd., China
CANADIAN NUCLEAR SAFETY COMMISSION, Canada
ENEA, Italy
ENERGORISK, Ukraine
ELECTRIC POWER RESEARCH INSTITUTE, United States
FRAMATOME GMBH, Germany
GESELLSCHAFT FUR ANLAGEN UND REAKTORSICHERHEIT (GRS), Germany
INSTITUTE OF NUCLEAR RESEARCH AND NUCLEAR ENERGY – BULGARIAN ACADEMY OF SCIENCES, Bulgaria
IRSN, FranceJAPAN ATOMIC ENERGY AGENCY, Japan
JRC -JOINT RESEARCH CENTRE- EUROPEAN COMMISSION, Belgium
KOREA ATOMIC ENERGY RESEARCH INSTITUTE, South Korea
KIT, Germany
LIETUVOS ENERGETIKOS INSTITUTAS, Lithuania
LGI CONSULTING, France
NINE NUCLEAR AND INDUSTRIAL ENGINEERING, Italy
PSI, Switzerland
STATE ENTERPRISE STATE SCIENTIFIC AND TECHNICAL CENTER FOR NUCLEAR AND RADIATION SAFETY, Ukraine
TRACTEBEL ENGINEERING, Belgium
TECHNICAL UNIVERSITY OF SOFIA, Bulgaria
UNIVERSITA DI PISA, Italy
UNIVERSITA DEGLI STUDI DI ROMA LA SAPIENZA, Italy
VYTAUTO DIDZIOJO UNIVERSITETAS, Lithuania
VTT, Finland
WOOD NUCLEAR LIMITED, United Kingdom